Nationwide, Swindon
Nationwide, Swindon
FES was engaged after a two-stage tender process to develop the client’s base-designs, with full responsibility to deliver a new Central Energy Centre within this Corporate Office Estate, with over 3,000 staff in the Wakefield House Building.
The design and build project included the construction of a new Energy Centre within a complex live corporate HQ development.
FES also had responsibility to decommission the existing redundant Energy Centre and carry out a seamless changeover to the new Centre without loss of any Building Services to this critical corporate office complex. As the new Energy Centre was to be located some 500m from the old one, substantial reconfiguration of existing primary and secondary MEP, HVAC and Utility Services was required. All works successfully executed whilst maintaining all Building Services.
All works were successfully delivered without incident or loss of service for the client.