The University of Edinburgh hired FES as a Design & Build Main Contractor on a single stage design and build contract to deliver the first of six contracts of the Kings Building Infrastructure project in the south of Edinburgh.
The project helped modernise the existing electrical and mechanical infrastructure on-site, including 4 new substations and the installation of a boiler.
Included was installation of Low Voltage and High Voltage electrical wiring of campus. We took several phases as one of the best approaches to ensure the continuation of the live campus environment with minimum disruption for staff members and students.
The project was successfully delivered within a live campus environment.
This stage of infrastructure updates is the first in a planned 10 – 15 years of significant new developments planned for the campus.